1978 CJ7 Frame Rebuild

Jeepfan

New member
Hi everybody,

I have a 1978 CJ7 torn down to the 2 frame rails and have welded in new steel u channel into the outside frame rails replacing the rusted out inside u channel.

If I was to do this again I think I would drill holes and do button welds but this time I have welded continuously causing the frame rails to bend in and twist a bit from the contraction of the welds.

Hence I will need to straighten the frame rails before I can reassemble the body to them.

Has anyone done this before and have any good ideas to accomplish this?

Any advice would be hugely appreciated!

Thanks much!

Bill:redface:
 

I think I’d just get a new frame, well new to you frame. But I’m lazy like that! Lol! I was lucky on my 1979 cj7 build and found a good frame at the local Jeep junk yard.


Sent from my iPad using Jeepz.com mobile app
 
Back
Top